How to Implement Earned Value

~ By Kay Wais

A plant growing between coins in a mans hands

Earned Value (EV) is one of the most sophisticated and accurate methods for measuring and controlling project schedules and budgets. Earned value has been used extensively in large projects, especially in government projects. PMI is a strong supporter of the Earned Value approach because of its ability to accurately monitor the schedule and cost variances for complex projects.

Although it is sophisticated, Earned Value can be scaled to be appropriate for any size of project. The key is in the project planning.

There are three primary advantages to using Earned Value:

  1. Accuracy in reporting
  2. Ability to deal with the uneven rate of project expenditures and work
  3. The early warning it provides project managers, allowing them to take the necessary corrective action should the project be spending more money than it is physically accomplishing

Other less professional methods for measuring budget and schedules generally only monitor the percent of the time through the schedule and make the often mistaken assumption that this is also the percent that the project should be through the budget. But cost and project progress generally are not evenly expended through a project. The reason Earned Value stands above the alternatives is that it accurately deals with this reality. Earned Value warning signals become available to management as early as 15 to 20 percent into a new project, in ample time to take corrective measures.

How to Implement Earned Value

In order to employ Earned Value, we must have a baseline plan (including a detailed, workload levelled, progress schedule) in place that will allow us to continuously measure seven points of data. The textbooks, including the referenced ones at the end of this paper, say that this is easy. However in my reality it often is not easy because scheduling to this level of detail at the beginning of the project is challenging and dynamic.

Earned Value requires the kind of data most projects have, but we may not look at the data in quite the same way. Earned Value has a focus on its percent-complete position…against its (100 percent) defined scope.

In order to employ Earned Value we must first know at all times what the "planned value" is as at any point in time. So Earned Value is built on a very structured project plan. It requires a detailed WBS, time and cost estimates for all of the work packages, a workload levelled master schedule, and a meticulous change management methodology (with this last part being the hardest for my projects).

To determine the planned value, we need to calculate two important base factors, 1) how much physical or intellectual work we have scheduled to be completed as of the point of measurement, and 2) what was the budgeted value of the work scheduled.

To measure Earned Value we need two new points of data: 3) how much of our scheduled work have we actually accomplished? And 4) what is the budgeted value of the work actually performed?

The next item is for the Earned Value work we have accomplished, what 5) costs have we actually spent and/or incurred.

The Planned Value = Items 1 and 2
The Earned Value = Items 3 and 4
Actual Costs = 5

Next we need to understand 6) the "schedule variance" which in Earned Value is the difference between our planned value scheduled and our Earned Value achieved. Lastly, we need to know 7) what our "cost variances" have been. This is determined by relating our Earned Value accomplished against the actual costs pent or incurred.

These are the basics. There are many calculation tables, charts, at graphs that can help visual display this data, variances, and trends. These are frosting on the cake and not necessary to use Earned Value. Earned Value summary reports often will provide a revised estimate to complete based on the extension of the current trends.

Summary

Implementing Earned Value is well worth the effort. The advantages of building a detailed plan, controlling and monitoring the project, and accurate reporting and forecasting are all critical to professional project management.

The biggest challenge our company experienced when implementing Earned Value was changing our time reporting and accounting system to decompose projects, allowing time and cost to be attributed to specific project deliverables. Also, as mentioned earlier, the detailed schedule must be planned early and translated to project costs - to give us the planned value at any specific point in time.

Once armed with the Earned Value information, the project manager and stakeholders can truly understand the current status of a project, the rates of variances, and (once significantly into the project) often accurately predict the end schedule and budget compared to the original estimates.


References and Resources

Fleming, Quentin and Koppelman, Joel from Primavera Systems. Earned Value Project Management … an Introduction (PDF)

Fleming, Quentin and Koppelman, Joel, Earned Value Project Management, Second Edition (Kay read this book in Feb. of 2001)

Milosevic, Dragan, Project Management Toolbox, ISBN 0-471-20822-1, Wiley Press. 2003


Successful Projects is a project management training company in La Crosse, Wisconsin. Successful Projects can be found at http://www.successfulprojects.com


Advertisement


Comments

Be the first to comment on this article.

Add a comment



(never displayed)



 
2000
What is the day after Thursday?
Notify me of new comments via email.
Remember my form inputs on this computer.

10 Golden Rules of Project Risk Management

Three red dice reading: Manage your risk

The benefits of risk management in projects are huge. You can gain a lot of money if you deal with uncertain project events in a proactive manner.

Work Breakdown Structure 101

Hierarchy icons on a white background

Work Breakdown Structure is a tool project managers use to break projects down into manageable pieces. Here's why you need one and how to create your own.

Is Project Management Certification Worth It?

University students in a classroom watching a presentation

Do recognised professional credentials increase your worth in the jobs market? Will the effort of studying to pass the exam improve your career prospects?

Introduction to Scrum

Rugby scrum in a big push

Scrum is one of the simplest agile methodologies and is proven to be highly effective for software development and more general product development.

PROJECT SMART is the project management resource that helps managers at all levels improve their performance. We provide an important knowledge base for those involved in managing projects of all kinds. With weekly exclusive updates, we keep you in touch with the latest project management thinking.

WE ARE CONNECTED ~ Follow us on social media to get regular updates and opinion on what's happening in the world of project management.


Latest Comments

Ashwini Pendharkar commented on…
10 Golden Rules of Project Risk Management
- Tue 20 June 1:32pm

Tery commented on…
A Brief History of SMART Goals
- Mon 19 June 10:10pm

Tammy Marin commented on…
Better Coaching Using the GROW Model
- Thu 15 June 10:37pm

Latest tweets

General Project Management • Please Advise: Does PRINCE2 Practitioner Exam Scenerio Changes… https://t.co/OK90gkJzMN #projectsmart #pmot about 10 days ago

RT @rkelly976: “I cannot give you the formula for success, but I can give you the formula for failure, which is: Try to please everybody.”… about 13 days ago

General Project Management • Re: Do I need project management software? https://t.co/u4Tu1fnzuY #projectsmart #pmot about 13 days ago