Improve Project Success with Better Scope Management

By Avneet Mathur
UML Scope Diagram

Overview

The Project Management Institute Project Management Body of Knowledge (PMBOK) defines product scope as the features and functions that are to be included in a product or service. It defines project scope as the work that must be done to deliver a product with the specified features and functions. Project scope management is defined as the processes required to ensure that the project includes all the work required, and only the work required, to complete the project successfully.

Problems with Project Scope

The problems that may arise with the Project Scope are:

Ambiguous
Ambiguity in scope leads to confusion and unnecessary work. To avoid this, the scope needs to be clear and to the point.

Incomplete
Incomplete scope leads to schedule slips and hence finally cost overrun. To avoid this, the scope needs to be complete and accurate.

Transient
Transient scope leads to what is known as scope creep which is the primary cause of late deliveries and potentially "never ending" projects. To avoid this, the scope document needs to be finalised and remain unaltered for the duration of the project. Changes to the scope need to be made through a formal change process.

Uncollaborative
A scope that is not collaborated leads to misinterpretations in requirements and design. To avoid this, the scope document should be shared with all stakeholders.

Capturing Project Scope

The defence against all these problems is to clearly define the project's scope at the beginning. Once defined then validate that scope with all the key stakeholders, getting their buy in and consensus on the scope before charging ahead.

Some tools and techniques useful in capturing the project scope are:

  • Define the project need
  • Identify key stakeholders
  • Identify project drivers
  • Develop operational concepts
  • Identify external interfaces

1. Define the Project Need

When scoping the project it very important to define the need for the project. Mistakes are made here because most of us define implementation rather than the need.

Buying a car is an implementation but getting from point A to point B is the need. Implementation can change based on the need but the need should remain unchanged. Over time the implementation can be taking a bus based on various factors such as cost or available resources but the need remains the same (getting from point A to point B)

If the need changes over time, you might not know what is really needed and you cannot build a product to meet a moving target.

2. Identify Key Stakeholders

The PMBOK defines stakeholders as: "individuals and organisations who are actively involved in the project, or whose interests may be positively or negatively affected as a result of project execution or successful project completion".

The aim of inclusiveness makes the identification of stakeholders important; excluding an important stakeholder can undermine the process. No hard or fast rules exist to tell us whom to involve and how. What we do know is that stakeholder involvement is context-specific; what works in one situation may not be appropriate in another.

Stakeholders in a project can include people those who:

  • Buy it
  • Sell it
  • Use it
  • Train others to use it
  • Design it
  • Develop it
  • Test it
  • Market it
  • Maintain it
  • Expect to profit from it.

3. Identify Project Drivers

Organisations are driven by many outside influences, e.g., regulations, standards, laws, and other considerations. A major driver for many organisations is the set of existing equipment, software, or processes. Other drivers include security and safety concerns. Depending on your type of business you may be affected by an overabundance of regulations from external organisations.

4. From Needs to Requirements. Develop Operational Concepts

Operational concepts bridge the gap between product scope and formal requirements. The operational concepts are plain-language descriptions of user product/system interactions in the life of your product for both nominal and off-nominal conditions. How will it be used, manufactured, tested, installed, maintained, stored, and decommissioned? Operational concepts may be use cases, operation plans, scenarios, or other methods of uncovering gaps in knowledge and scope.

Many great products start with an intuitive operational concept. High-level operational concepts will help in the creation of the project scope. In the beginning, there may be several alternatives the project could select to meet the project need. In fact, the operational concept may exist before the need statement. Scenarios allow different operational ideas to be explored. Then the feasibility of each scenario is examined and more ideas are explored. A needs statement can be written after the scenarios capture the true need. The operational concept, like all other parts described above, is iterative. A single alternative must be selected and reflected in the project scope to ensure that key stakeholders share the vision before requirement capture begins.

5. Identify External Interfaces

Serious problems arise at interfaces. The project is particularly vulnerable to interfaces with other products over which you have no control.

External interfaces fall into two broad categories:

  • User (usually a human being) and
  • Everything else

User external interfaces include buttons, levers, handles, straps, warning bells, safety labels, and displayed information. Non-user external interfaces include command, data, operating system, computer system, and existing equipment used with your product.

There are several external interface considerations that should be made prior to writing requirements, including the need to interface with a non-standard product, lack of interface documentation, and the risk of changes to products out of your control with which yours must interface. All of this information is vital to the project's risk assessment and change management processes.

There are different classes of interfaces you must consider: First, there are fixed interfaces that are well known and unchangeable. Second, there may be existing interfaces that can be changed, either to save money, or because that interface is being updated. The third type of external interface is one that does not currently exist. In both the second and third cases, negotiation must be completed and agreed to as part of the process.

Conclusion

More than seventy percent of projects fail. When projects fail, it's rarely technical. Over eighty percent of those projects fail due to project management. Projects, like business, often fail because they are not properly managed. Scope creep is a major aspect of project failure. This can be mitigated by following simple procedures such as having a scope document that all the stakeholders agree on and on having a change management plan if there are supposed to be modifications to it. Manage scope and make your project a part of the successful thirty percent.

Avneet Mathur works for Zeratec, Inc. which provides utility computing solutions to individuals and companies, as their Chief Technology Officer managing various projects for the organisation. He is a Certified Project Management Professional, as awarded by the Project Management Institute. Avneet holds an MBA in General Business Administration, with an emphasis in Entrepreneurship and Finance, with an additional Master's Degree in Computer Science and Networking from University of Missouri, Kansas City. He also has a Bachelor's Degree in Computer Science from the Aurangabad University, India. He can be reached at Avneet_mathur@hotmail.com for further questions.

Comments page 1 of 1
Click here to add a comment
Duncan
Posted 267 days ago
It was published on 4th August 2007.
Cristina
Posted 268 days ago
which date was this article published? thanks
Anthony
Posted 397 days ago
please and please when aricles are written and posted the dates sould be indicated for appropriate referral.
Bill Duncan
Posted 496 days ago
This article starts out by quoting the definitions of "product scope" and "project scope" that I developed for the original (1996) PMBoK Guide, then gets tangled up in its undies by mixing the two throughout the article.
 

Article Categories

Related Articles

Dealing with "Scope Creep" in Software Development Projects
Scope creep is a significant risk in software development projects. We discuss why this is so, and how to avoid or at least mitigate the risk. New software is usually developed as a result of a customer identifying a need. The next step is to specify how the software will meet that need; specifically, what functionality will be developed.

Getting Your Project In Sight
Have you ever had a project that took longer than was expected, cost more, or ended up totally different than the original plan? You're not alone. Most projects sway from the initial idea, but they shouldn't and don't have to. By keeping the proper scope of your project, you will be able to finish on time, on budget, and with fewer headaches.

Managing Project Scope
Ok, you're about to kick-off a project you're managing. The scope and budget are set, the team knows what they're delivering, and everyone is ready to begin. You're confident that hours have been allocated appropriately, but you also know how easy it is for scope to slip away from you - you need to keep a good handle on this project to ensure the team doesn't squander their hours and push the project over budget. In this article, I'll review some solid tactics you can employ to progressively manage your project budget and maintain total visibility from beginning to end.

Stop Scope Creep Running Away With Your Project
Scope creep is one of the most common reasons projects run over budget and deliver late. Although changes to scope during a project are often done with the best of intentions, scope creep is considered a negative occurrence to be avoided.